 |
The Visitor Center is receiving a new copper base; lead coated resurfacing, complete with new covering on the dormers and gutters. The old roof was allowing water to intrude below the roof surface. The workmen shown here are removing the old tarpaper and copper to expose the base roof. The completion date for the entire roof is early July 2004.
(Photo by Jack Welsh, Staff Engineer, Arlington National Cemetery)
|
| |